A-13
INSTALLATION
STEP 14 – PREPARE TO ASSEMBLE UPPER MOD-
ULES TOGETHER
Move two module assemblies close together in preparation for
joining together
STEP 15 – PREPARE TO ASSEMBLE UPPER MOD-
ULES TOGETHER
Apply bead of caulk
between all double
strips of foam, then
quickly proceed to
step 16
Remove screws
from top panels
and slide them to
the right as shown.
Remove screws
from top panels
and slide them to
the left as shown.
PRISM
®
Summary of Contents for Prism 4
Page 31: ...A 23 INSTALLATION d Reclasp filter handles FIGURE A 15 PRISM ...
Page 77: ......