STEP 20– ASSEMBLING UPPER MODULES TO
LEG BASES
Using appropriate rigging, lift upper modules on to leg bases but
keep a small gap between to adjust when fastening together.
Thread 3/8” flange bolts up into all interior rivet nuts (2 in each
leg). These should all be started before setting full weight of
upper modules on leg bases. Complete assembly by installing all
¼” flange bolts and then fully tighten 3/8” flange bolts.
Fully tighten all leg cross brace bolts.
Fasteners required:
3/8” flange bolts: 2 for each leg
¼” flange bolts: 5 between each leg
A-19
INSTALLATION
Location for 3/8”
flange bolts (2 per
each leg)
Location for 1/4”
flange bolts (5
located between
each leg)