LTL TATM LTL - Vol 1
Issue 1.0
11
remove the outer mooring ropes individually and secure them to the ratchet straps or winches one at
a time.
The up wind ropes will be subjected to a lot more load than the remaining ropes.
The first ropes to secure during mooring are those perpendicular to the wind direction
(Fig 3). These
will steady any sideways motion which should make it easier to connect the remaining ropes.
Place the karabiner through the first loop at the end of the outer mooring ropes.
When all outer mooring lines are secured at the end loop, starting with the perpendicular, move the
karabiners progressively up to the highest loop possible on each rope and tighten (Refer to Section
3.1).
The balloon should now be stable and movement should be minimal.