Issue 2.0
Page 3
ENVELOPE CABLES
– NON METALLIC:
If any cable has been damaged in a way to expose the Kevlar
core (yellow braid) or reduce the flexibility of the exterior polyester cover, the cable must be replaced
before the balloon may be flown.
FUEL SYSTEM:
When any damage exists to fuel hoses, fuel tanks, tank or burner fittings, burner coils,
burner frame, or when any fuel leak occurs in any fuel fitting. If any burner, tank valve or pressure gauge
is not functional, or experiences a fuel leak, it must be repaired or replaced before the balloon may be
flown.
BASKET:
When there are more than five strands of a basket wire broken, it must be repaired or replaced
before the balloon may be flown.
BASKET
– PLYWOOD FLOOR:
If the plywood floor has separated from the lower stainless frame or if
the floor is damaged so that a 250 mm crack is visible on both sides of the floor, the basket must be
repaired or the damaged part replaced before the balloon may be flown.
Any damage must be repaired in accordance with the instructions contained in the Section 5 of this
manual. All repairs must be noted in the balloon log book and approved by a designate of the appropriate
authority.
Summary of Contents for Racer 56
Page 47: ...LTL HABMM Issue 2 0 Page C1 4 Figure 2 Overview of Vortech Double Burner ...
Page 48: ...LTL HABMM Issue 2 0 Page C1 5 Figure 3 Load Tape Repairs ...
Page 49: ...LTL HABMM Issue 2 0 Page C1 6 Figure 4 Overlying Tape Repairs ...
Page 50: ...LTL HABMM Issue 2 0 Page C1 7 Figure 5 Envelope Cable Loop Repairs ...
Page 51: ...LTL HABMM Issue 2 0 Page C1 8 Figure 6 Bowline Knot ...