Customer Training Guide
Pre-Launch Wave Glider® SV3
08033 Rev A
2
Chapter 2. SV3 Pre-Launch Checklist
Date:
Auto filled
Date of inspection.
Tech(s):
Name of individual(s) responsible for Pre-Launching the Wave Glider.
Payload(s):
Types of payloads and sensors connected to the system.
Ship/Op Area:
Name of vessel deployed from and where the Wave Glider will be operating (e.g.
Po’okela/Kawaihae).
Glider Name:
Auto filled
Name of Wave Glider.
Organization:
Name of WGMS organization that the Wave Glider will be operating in (e.g.
training.wgms.com).
Project:
Name of the current project that the Wave Glider will operate under (e.g. Training).