Version
01.2017
2
OPERATION AND INSTALLATION MANUAL
INTRODUCTION
1. GUARANTEE CONDITIONS
1.1.
SAFETY WARNINGS
…………………………………………………………………………………..3
1.2. GUARANTEE CONDITIONS
…………………………………………………………………………..3
2.
INSTALLATION IN ACCORDANCE WITH LOCAL AND NATIONAL STANDARDS
2.1.
OPERATING AREA
…………………………………………………………………………………….4
2.2. PRECAUTIONS
…………………………………………………………………………………………4
2.3. CONNECTION TO THE EXTERNAL AIR INTAKE
………………………………………………….4
2.4. CONNECTION TO THE FLUE PIPE
………………………………………………………………….5
2.5. ASSEMBLY OF CLADDING
…………………………………………………………………………...5
3. CONTROL OF THE APPLIANCES
……………………………………………………………………..6 - 8
4. DIMENSIONS AND TECHNICAL SPECIFICATIONS
…………………………………………………….9
5. INSTALLATION AND ASSEMBLY
5.1
.
PREPARATION AND UNPACKING
…………………………………………………………………..9
5.2. GENERAL ASSEMBLY RULES
……………………………………………………………………….9
6. OPERATION
6.1.
PRE-LIGHTING WARNINGS
……………………………………………………………………..9
6.2. CHOICE OF FUEL
……………………………………………………………………………………10
6.3.
FIRST LIGHTING
……………………………………………………………………………………10
6.4. CONTROL OF COMBUSTION
…...…………………………………………………………………10
6.5. EMERGENCY SITUATIONS
…………………………………………………………………………11
7.
MAINTENANCE AND CLEANING IN CHARGE OF THE USER
7.1. CLEANING THE GLASS
……………………………………………………………………………..11
7.2. CLEANING OUT THE ASHES
……………………………………………………………………….11
7.3. CLEANING THE INTERIOR WALLS (refractory)
………………………………………………….12
7.4. CLEANING THE DEFLECTOR IN CAST IRON ……………………………………………………12
7.5. CLEANING OF PAINTED PARTS
…………………………………………………………………..12
8. CLEANING TO BE DEALT WITH BY SPECIALIZED TECHNICIAN
8.1. CLEANING FLUE PIPE
……………………………………………………………………………….12