Pre-Cut Colonial Williamsburg/Pinehurst Garden Shed
ASSemBly InStruCtIOn mAnuAl
© 2018 Little Cottage Co.
4
Assembly Instruction manual
13.
Locate the gable wall parts where the double door
is.
14.
Nail the two 2x4’s together with 3” nails as shown.
15.
Continue with 3” nails as shown.
17.
Temporally install the 2x4 in between the door opening
to square the wall. Fasten with 2 1/2” screws.
18.
Install Smartside siding as shown per diagram and
fasten with 2” nails.
16.
Fasten 48” header with 3” nails.