Pre-Cut Colonial Williamsburg/Pinehurst Garden Shed
ASSemBly InStruCtIOn mAnuAl
© 2018 Little Cottage Co.
5
Assembly Instruction manual
19.
Continue installing Smartside and always fasten the
top first to keep flush with top plate.
20.
Install small strip on header as shown.
21.
Locate 2 3/4” door trim as shown.
22.
Fasten the door trim with 2” nails every 8 inches.
23.
Make sure the door opening is square.
24.
Install the doors as shown.