background image

Parts List

Qty - 1

Trampoline Mat stitched with 
Triangle-rings and safety pad

Qty - 1

Enclosure Netting

Qty - 3

Plastic Horizontal Leg Base

Qty - 6

Plastic Vertical Leg Extension

Qty - 6

Vertical Leg Extension

Qty - 6

Corner Top Rail with Socket

5

Qty - 6

Top Rail

Qty - 3

Horizontal Tube with Foam

Qty - 36

Galvanized Springs

Qty - 6

Bolt

Qty - 6

Self-locking screw

Qty - 6

Cap Nut

Qty - 12

Arc Washer

Qty - 6

Spring Washer

Qty - 1

Wrench

Qty - 6 

Button Cap

Qty - 1

Spring Loading Tool

with Allen wrench

and screwdriver

Qty - 6

Straight Frame Tube with Foam

Qty - 6

Curved Frame Tube with Foam

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

Remember to use gloves during assembly to avoid pinching.

At least 2 people are required to assemble the trampoline.

Please refer to this page for parts descriptions and letters. The assembly steps use these descriptions and letters as reference for your convenience. 

Make sure that you have all parts listed. 

ASSEMBLY INSTRUCTIONS

STEP 1 - Support Assembly

6

Tools required

Adult assembly required

(not included)

S

Qty - 1

Shoe Bag

T

Insert a vertical leg extension (F) through hole on each end of a 
plastic horizontal leg base (C). Repeat for remaining 2 plastic 
horizontal leg bases (C). 

Insert a plastic vertical leg extension (D) over each vertical 
leg extension (F). Repeat for remaining 5 vertical leg 
extensions (F). 

Layout 3 sets Support Assemblies (pre-assembled in STEP 1) as shown above. 

STEP 2 - Frame Layout

Insert the corner top rail with 

socket (E) to the Support Assembly 

as shown. Repeat this for all corner 

top rails with sockets (E).

IMPORTANT: hole in corner top 

rail should align to the hole in 

vertical leg extension.

IMPORTANT: be sure the curve side of the plastic 

horizontal leg bases (C) and the curve of the top 

rails (G) are facing outward.

There are total of 12 pieces of tubing and 3 sets Support Assemblies (pre-assembled in STEP 1) that 

are needed to assemble the frame. 

Assemble top rail (G) into each end of corner top rail with socket (E).  To connect parts, 

simply slide the section of tubing that is smaller on one end into the adjacent section that 

has a larger opening as shown.

Holes must face up.

Screw a button cap (R) to the vertical leg extension (F) using 
spring Loading Tool (S). Repeat for remaining 5 vertical leg 
extensions (F).

Recess on plastic vertical leg extension (D) must fit into 
leg base (C) as shown.

Meijer.com

Reviews: