background image

638466

ADULT ASSEMBLY AND SUPERVISION REQUIRED.

ADULT BATTERY INSTALLATION REQUIRED.

Illustrations are for reference only. Styles may vary from actual contents.

AGES 6-36 MONTHS

SUBMARINE ASSEMBLY

3 in 1 Adventure Course

3 in 1 Adventure Course

2. Snap the submarine walls (A, B) into the 
    bases (C, D).  Snap the mirror spinner (Y) 
    onto the periscope on the right submarine 
    wall (B). 

3. Snap the propeller spinners (J) onto the sides of 
     the submarine walls.
NOTE: Propellers cannot be removed once installed.

B

E

A

(Not included)

CONTENTS

A. 1 Left Submarine Wall 
    with submarine wheel
B. 1 Right Submarine Wall
C. 1 Rear Submarine Base
D. 1 Front Submarine Base
E. 4 Connectors
F. 1 Front Arch
G. 1 Rear Arch

H. 1 Cross Beam
I.  1 Fabric Canopy
J. 2 Propeller Spinners
K. 1 Left Tunnel Base
L. 1 Right Tunnel Base
M. 1 Curly Ring
N. 1 Hanging Jellyfish
O. 4 Balls

H

J

Q

R

S

M

N

O

P

K

Prior to playing, an adult must install fresh alkaline batteries (not included).  Here’s how:
1.  Using a Phillips screwdriver (not included) remove the screw and battery compartment cover from 

the bottom of the octopus handle.

2. Insert two (2) AA alkaline batteries (not included) making sure the (+) and (-) ends face the proper    

direction as indicated inside the battery compartment.

3.  Replace the compartment cover and tighten the screw.

BATTERY INSTALLATION

1

2

3

TUNNEL ASSEMBLY

7

7. Snap two connectors (E) onto the  
    front of the tunnel bases.

U

1.5V AA / LR6

1.5V AA / LR6

2 x 1.5V AA Batteries

1. Snap two connectors (E) onto the rear 
    submarine base (C).

P. 1 Octopus Head
Q. 1 Octopus Handle
R. 2 Octopus Arms
S. 1 Left Octopus Leg
T. 1 Right Octopus Leg
U. 1 Left Octopus Base
V. 1 Right Octopus Base
W. 20 Screws
X. 4 Screws
Y. 1 Mirror Spinner

C

D

L

T

V

E

E

C

D

C

D

B

A

O

J

J

E

E

B

A

Y

W x 20

X x 4

Y

OFF/VOLUME

F

G

I

6

6. Slide the curly ring (M) through the loop 
    on the front of the canopy. Then, slide 
    the loop on the hanging jellyfish (N) over 
    the bottom of the curly ring.

4. Snap the arches (F, G) into the tunnel bases 
    (K, L), matching the half circle and full circle 
    arch bottoms with openings on the  
    tunnel bases. 

4

half 

circle

full

circle

M

N

K

L

5

H

5. Attach the cross beam (H) to both  
    arches (F, G) under the canopy (I).

F

G

I

F

G

Reviews: