2-74
Removal and Installation
January 24, 2017
Removal and installation of DEF pump
CLG835H
3. Unscrew the clamp of urea
pipe with straight screw-
driver, and then pull out the
pipe from the urea tank.
Seal every port with plastic
sealing membrane as
required.
Tool:
Straight screw-
driver
Plastic sealing
membrane
4. Remove the 4 captive bolts
from the DEF bracket, and
take out the DEF tank from
the counterweight bottom.
Tool:
Open-end
wrench 13#
5. Unscrew the mounting strap
bolt of the DEF tank and the
tank can be taken out.
Tool:
Open-end
wrench 10#
Figures
Contents
Tools
P18P00115
P18P00116
P18P00117
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...