4-93
January 24, 2017
Testing and Adjustment
CLG835H
Pressure test of work hydraulic system
2. Start the machine, operate
the lever to lift boom to
horizontal position (when the
diesel engine and hydraulic
oil is under normal operating
temperature, the diesel
engine will be in idle
running)
3. The level returns to the
neutral position;
4. Operate the pilot valve to
make it in bucket tilt back so
as to rotate the bucket to the
maximum rear tilting back
position and keep it
suppressed;
5. When taking step 4, the
maximum pressure value of
pressure gauge at pressure
measuring point shall be
19±0.3MPa/ 2755±43.5psi.
Figures
Operation instruction
Tools
P18H00099
P18H00100
P18H00101
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...