Pressure test of work hydraulic system
CLG835H
Boom cylinder test
Temperature of test oil:50±5°C\ 122±41°F
Test items
Test method
Criterion
Commissioning
Adjust the pressure of test system to make the
tested hydraulic cylinder start without load condi-
tion and conduct full stroke reciprocating motion
for more than 3 times to bleed the air from the
hydraulic cylinder.
The hydraulic cylinder operates smoothly with-
out being stuck.
Pressure tight
test
Stop the tested hydraulic cylinder piston at both
ends of stroke respectively (single-acting hydrau-
lic cylinder stopped at the limit position of stroke),
then apply 1.5 times rated pressure of oil to the
working chamber and keep for 10s.
External leakage and damaged parts are not
allowed.
Internal leakage
test
Supply oil to the working chamber of tested
hydraulic cylinder, then increase the pressure to
the working pressure, measure the oil leakage at
port of small cavity for 2min.
Internal leakage
≤
0.28ml/min\ 0.000074US gpm
Stroke test
Stop the tested hydraulic cylinder piston at the
limit positions at both ends of stroke respectively,
then measure its stroke length.
727mm~729mm\ 28.6~28.7in
P18H00106
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...