4-166
Removal and Installation
January 24, 2017
Steering hydraulic system
CLG835H
3. Install LS port joint and tight-
ening torque is 35±5Nm
4. Connect hose: "T_ oil return
pipe of metering pump" and
tightening torque is
116±5Nm
5. Connect hoses: "P_ oil inlet
pipe of metering pump", "L_
left steering pipe" and "R_
right steering pipe" and tight-
ening torque is 89±4Nm\
65.6±2.95lbf·ft
6. Connect hose: "LS_ LS pipe
of metering pump" and tight-
ening torque is 16±1Nm\
11.8±0.74lbf·ft
7. Fill the hydraulic oil, start the
machine and idle it for 5min;
8. Turn slowly for at least 10
times and bleed the air in
the line.
9. Stop the machine and check
it for leakage.
10. Check whether the hydraulic
oil level is normal, and if not,
please fill the hydraulic oil to
the specified level
Figures
Operation instruction
Tools
P18H00244
P18H00245
T P
L
R
LS
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...