Removal and Installation
CLG835H
Removal and installation of hinge assembly
Installation of hinge assembly
9. Knock out the bearings of
upper and lower hinge with
bearing knocking tooling and
sledge hammer.
Bearing knock-
ing tooling and
sledge hammer
Figures
Operation instruction
Tools
P18S00016
Figures
Operation instruction
Tools
1. Lift rear frame with lifting
equipment and put it on spe-
cial firm tooling to make sure
it is in level, safe and steady
state (the front end of rear
frame is about 660mm/
25.98in from the ground,
and the rear end is about
980mm/38.58in from the
ground)
CAUTION: The
personnel operating
lifting equipment shall have
relevant qualifications, and
only can operate on the
premise that equipment and
lifting sling are normal and
safety is guaranteed!
Hoisting equip-
ment (over 5ton)
2. Put two pairs of bearing
cone cups into liquid nitro-
gen for freezing until there is
not a lot of smoke coming
out.
Liquid nitrogen,
hook fixture
Ground
P18S00017
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...