7-24
Removal and Installation
January 24, 2017
Removal and installation of work implement system
CLG835H
Installation of linkage
Figures
Operation instruction
Tools
1. Install linkage rear pin
1) Install two O-rings at the
rear end of linkage(connect
with the end of rocker arm)
2) Lift the linkage to mounting
position with lifting equip-
ment, and align the front
end hole of rocker arm with
the rear end hole of linkage.
WARNNING: Fingers
cannot be put into the
hole when aligning with the
hole, otherwise it may cause
personal injury!
CAUTION: The
personnel operating
lifting equipment shall have
relevant qualifications, and
only can operate on the
premise that equipment and
lifting sling are normal and
safety is guaranteed!
Hoisting
equipment (over
1ton)
3) Install lever rear pin, and
simultaneously select the
shim with appropriate thick-
ness according to clearance
of rocker arm and linkage to
make sure the clearance at
one side is less than 1mm/
0.04in.
Sledge hammer
P18S00037
P18S00038
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...