7-32
Removal and Installation
January 24, 2017
Removal and installation of work implement system
CLG835H
Replacement of work implement bushing
Replacement of linkage bushing
Replacement of rocker arm bushing
Figures
Operation instruction
Tools
Replace the linkage bushing
1. Remove seal rings (4, 5) with a
straight screwdriver
Straight
screwdriver
2. Knock out the linkage bushing (2,
3) with bushing knocking tooling
and sledge hammer
Shaft bushing
knocking tooling,
sledge hammer
3. Put new linkage bushing (2, 3)
into liquid nitrogen for freezing
until there is not a lot of smoke
coming out
Liquid nitrogen,
hook fixture
4. Install frozen linkage shaft bush-
ing (2, 3) into linkage (1) with
shaft bushing knocking tooling
and sledge hammer , and
reserve mounting position for
seal rings on both sides.
Shaft bushing
knocking tooling,
sledge hammer
5. Knock new seal ring (4, 5) into
linkage (1) gently with copper bar
Copper bar
4
4
2
1
5
5
3
P18S00051
1. Linkage
2. Bushing
3. Bushing
4. Seal ring
5.Seal ring
Figures
Operation instruction
Tools
Replace the rocker arm shaft bushing
1. Remove the seal ring (3) with a
straight screwdriver
Straight
screwdriver
2. Knock out rocker arm bushing (2)
with bushing knocking tooling and
sledge hammer.
Shaft bushing
knocking tooling,
sledge hammer
3. Put new rocker arm bushing (2)
into liquid nitrogen for freezing
until there is not a lot of smoke
coming out.
Liquid nitrogen,
hook fixture
4. Install frozen rocker arm bushing
(2) into rocker arm (1) with
bushing knocking tooling and
sledge hammer, and reserve
mounting position for seal rings
on both sides.
Shaft bushing
knocking tooling,
sledge hammer
5. Knock seal ring (3) into rocker
arm (1) gently with copper bar.
Copper bar
1
2
3
3
1
2
3
3
P18S00052
1. Rocker arm
2. Rocker arm bushing
3. Seal ring
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...