7-39
January 24, 2017
Removal and Installation
CLG835H
Removal and installation of work implement system
2) Lift linkage front end to
mounting position with lift-
ing equipment, start the
machine, operate control
lever to adjust linkage posi-
tion, and align the upper
hole of bucket with linkage
front pin hole.
WARNNING: Fingers
cannot be put into the
hole when aligning with the
hole, otherwise it may cause
personal injury!
CAUTION: The
personnel operating
lifting equipment shall have
relevant qualifications, and
only can operate on the
premise that equipment and
lifting sling are normal and
safety is guaranteed!
Hoisting
equipment (over
3ton)
3) Install the front pin of link-
age, and simultaneously
select the shim with appro-
priate thickness according
to clearance of bucket and
linkage to make sure the
clearance at one side is
less than 1mm/0.04in.
Sledge hammer
Figures
Operation instruction
Tools
P18S00062
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...