7-50
Removal and Installation
January 24, 2017
Option work implement and accessory system
CLG835H
Option work implement and accessory system
Option of work implement system
Work implement system has standard boom and extension boom for selection, please refer to "Work
Implement Parameters", and select according to practical use and needs of working conditions.
Option of accessory system
Procedure of selecting and assembling the bucket:
1. Identify the target condition.
2. According to working condition, select suitable bucket type according to Attached Table 1 - Bucket
Classification Table.
3. Look up the Attached Table 3 Bulk Density of Bulk Materials to obtain the corresponding density of
material of working condition.
4. According to material density value, select corresponding bucket capacity by checking Attached
Table 2 - Recommendation List for Bucket Selection.
Attached table 1: The classification table of bucket
4. Replace the movable blade:
1) Remove nut (3), washer (4)
and bolt (5) fixing movable
blade.
2) Take down movable blade
(No.11).
3) Place new movable blade
(11) on corresponding posi-
tion of cutting edge.
4) Align the mounting holes of
movable blade and cutting
edge, and install new bolt
(5), washer (4) and nut (3).
50# Socket
wrench
Figures
Operation instruction
Tools
Types of Buckets
Acceptable range of
density
Main purposes
GP bucket
1.2~1.9t/m
3
Applicable to various working conditions, provided with excel-
lent insertion performance and material holding performance.
Light loading hopper
0.8~1.25t/m
3
It is mainly used in condition of loose light load material
Rock bucket
1.8~2.0t/m
3
It is under heavy load condition, such as rocks, etc.
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...