4-159
January 24, 2017
Removal and Installation
CLG835H
Work hydraulic system
Removal and installation of pilot valve assembly
Removal of pilot valve assembly
Removal steps:
Figures
Operation instruction
Tools
Before removal, release the
system pressure, place the
boom at the lowest position, and
place the bucket flatwise on the
ground.
1. Turn the pilot shut-off valve
to the off-position (vertical
position);
Note:
When turning the handle
to the vertical position, the work
implement will not work when
the driver operates the pilot
lever of the work implement.
Thus it can prevent mis-
operation of the control lever of
the work implement from
causing accidents.
P18H00231
P18H00232
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...