4-163
January 24, 2017
Removal and Installation
CLG835H
Steering hydraulic system
Steering hydraulic system
Removal and installation of metering pump
Removal of metering pump
Removal steps
8. Install the upper and lower
cover plate to the handrail
group by referring to the
Console Overhaul Manual;
Figures
Operation instruction
Tools
P18H00238
1. Upper cover plate
2. Lower cover plate
1
2
On-position
Figures
Operation instruction
Tools
1. Mark hoses installed on the
metering pump as: "T_ oil
return pipe of metering
pump", "P_ oil inlet pipe of
metering pump", "L_ left
steering pipe", "R_ right
steering pipe" and "LS_ LS
pipe of metering pump", the
marks shall be clear, firm
and shall not fall off.
2. Remove hoses at T, P, L, R
and LS ports of metering
pump and mask oil ports;
Marker:
Open-end
wrench: 17, 32,
36mm
P18H00239
T P
L
R
LS
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...