7-9
January 24, 2017
Removal and Installation
CLG835H
Removal and installation of hinge assembly
1. When the lower pin of bucket is 500mm/20in
from the ground, turn up the bucket to form an angle of
48° with horizontal plane, then select the plate with appropriate thickness in plate groups (1) to install
it on plane C according to the clearance between planes C and D, and guarantee block group (4)
clings with plane D after installation.
2. When the pin is 3,660mm/144in from the ground, and the discharge angle is 45°, select block with
appropriate thickness in block groups (6) to install it on plane A according to the clearance between
planes A and B, and guarantee it clings with plane B.
Removal and Installation
Removal and installation of hinge assembly
Removal of hinge assembly
Removal description:Before removing hinge assembly, please remove bucket assembly, work implement
assembly, front axle assembly, cab assembly, engine assembly, transmission assembly, radiator assem-
bly, cover assembly, counterweight assembly, hydraulic system, electrical system, etc., and only reserve
front frame, rear frame, rear axle assembly and tire.
Figures
Operation instruction
Tools
1. Pad the front and rear ends
of rear frame with special
firm tooling to make sure
rear frame is in level, safe
and steady state (the front
end of rear frame is 660mm/
25.98in from the ground,
and the rear end is 980mm/
38.58in from the ground)
2. Hook the front frame by a
lifting appliance and tighten
the hanger slightly
CAUTION: The
personnel operating
lifting equipment shall have
relevant qualifications, and
only can operate on the
premise that equipment and
lifting sling are normal and
safety is guaranteed!
Hoisting equip-
ment (over 5ton)
Ground
P18S00006
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...