7-28
Removal and Installation
January 24, 2017
Removal and installation of work implement system
CLG835H
Removal and installation of the boom
Removal of boom
Figures
Operation instruction
Tools
1. Remove the bucket
By referring to steps for removal
of bucket , remove the bucket.
2. Remove the linkage
By referring to the steps for
removing the linkage in removal
and installation of linkage,
remove the linkage.
3. Remove the rocker arm
By referring to the steps for
removing the rocker arm in
removal and installation of rocker
arm, remove the rocker arm.
4. Remove bucket tilting cylinder
By referring to the steps for
removing bucket tilting cylinder in
hydraulic system, remove bucket
tilting cylinder.
5. Remove boom cylinder
By referring to the steps for
removing boom cylinder in
hydraulic system, remove boom
cylinder.
6. Remove lubrication pipe
16# Wrench
P18S00044
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...