CHAPTER 8: TROUBLESHOOTING GUIDE
8-7
ECOLOAD S2
e13 Feeding length is too short
Description
When lathe chuck is open, the pusher feeding length is smaller
than parameter P01 <Too short dist> setup.
Troubleshooting
1.
Check if the lathe stopper is correctly positioned.
2.
Check if parameter P01<Too short dist> correctly set up.
3.
Check if the lathe chuck is too tight.
4.
Check if the spindle is blocked.
e14 15° positioning is failed
Description
The bar feeder fails to position the channel set at 15° position.
Troubleshooting
1.
If positioning is accomplished, check if sensor SR2 is
broken.
2.
If the positioning is not completed, check if anything blocks
the channel set.
3.
Check if the air pressure is too low to operate the
cylinders.
4.
Check if the air tubes, valves or cylinders are leaking.
e15 0° positioning is failed
Description
The bar feeder fails to position the channel set at 0° position.
Troubleshooting
1.
If positioning is accomplished, check if sensor SR1 is
broken.
2.
If the positioning is not completed, check if anything
blocks the channel set.
3.
Check if the air pressure is too low to operate the
cylinders.
4.
Check if the air tubes, valves or cylinders are leaking.
e16 Check SR1, SR2
Description
Sensor SR1 (0
˚
position) and sensor SR2 (15
˚
position) are
ON or OFF at the same time, this alarm will arise.
Troubleshooting
1. Check SR1 and SR2 to see if they are broken.
2. Check if PLC input contact X03 and X04 or the connecting
line are broken.
Summary of Contents for Eco Load S2
Page 1: ...LNS SA 2534 Orvin Switzerland www LNS group com Instruction manual ENG 9 ECO 01 ...
Page 2: ......
Page 5: ...CHAPTER 1 BASIC NOTIONS 1 1 ECOLOAD S2 CHAPTER 1 BASIC NOTIONS ...
Page 12: ...1 8 CHAPTER 1 BASIC NOTIONS ECOLOAD S2 ...
Page 13: ...CHAPTER 2 TECHNICAL DATA 2 1 ECOLOAD S2 CHAPTER 2 TECHNICAL DATA ...
Page 17: ...CHAPTER 2 TECHNICAL DATA 2 5 ECOLOAD S2 2 3 Z axis retraction system ˋˆˊ ˊˋˊ ˌˊ ˉ ˁˈ ʳ ˆˇ ˈ ...
Page 19: ...CHAPTER 3 SETTING INTO OPERATION 3 1 ECOLOAD S2 CHAPTER 3 SETTING INTO OPERATION ...
Page 36: ...3 18 CHAPTER 3 SETTING INTO OPERATION ECOLOAD S2 ...
Page 37: ...CHAPTER 4 ELECTRICS 4 1 ECOLOAD S2 CHAPTER 4 ELECTRICS ...
Page 43: ...CHAPTER 4 ELECTRICS 4 7 ECOLOAD S2 4 2 Circuit diagram ...
Page 45: ...CHAPTER 4 ELECTRICS 4 9 ECOLOAD S2 5 2 PLC I O DIAGRAMS ...
Page 54: ...4 18 CHAPTER 4 ELECTRICS ECOLOAD S2 ...
Page 55: ...CHAPTER 5 PNEUMATICS 5 1 ECOLOAD S2 CHAPTER 5 PNEUMATICS ...
Page 57: ...CHAPTER 5 PNEUMATICS 5 3 ECOLOAD S2 2 PNEUMATIC CIRCUIT DIAGRAM ...
Page 62: ...5 8 CHAPTER 5 PNEUMATICS ECOLOAD S2 ...
Page 63: ...CHAPTER 6 GENERAL DESCRIPTION 6 1 ECOLOAD S2 CHAPTER 6 GENERAL DESCRIPTION ...
Page 77: ...CHAPTER 7 OPERATION 7 1 ECOLOAD S2 CHAPTER 7 OPERATION ...
Page 98: ...7 22 CHAPTER 7 OPERATION ECOLOAD S2 ...
Page 99: ...CHAPTER 8 TROUBLESHOOTING GUIDE 8 1 ECOLOAD S2 CHAPTER 8 TROUBLESHOOTING GUIDE ...
Page 109: ...CHAPTER 9 APPENDICES 9 1 ECOLOAD S2 CHAPTER 9 APPENDICES ...