CHAPTER 4: ELECTRICS
4-13
ECOLOAD S2
7. INTERFACE
Before connecting, check to make sure that the voltage of the bar feed system
corresponds to the one provided by the lathe. The voltage of the bar feed system is
indicated on the identification plate. Only LNS (or certified) technician is authorized to
modify the interface or parameter system.
7.1. Description
The interface cable(s), between the bar feed system and the lathe is (are) provided by LNS.
Interface presents all the signals exchanged between the bar feeder and the lathe. The male interface
cable(s) which serves to transmit the interface signals is/are provided by bar feeder. The female side is
supplied by the lathe manufacturer.
There is a wide range of different interfaces available to meet the requirement of each lathe. A diagram of
the installed interface can be found in the electrical cabinet. Before connecting the bar feeder, make sure
the installed interface is suitable for your lathe. Contact us for any related questions.
A correct connection between lathe and bar feeder is critical for safe and reliable operation.
It is recommended to request a trained technician to install the bar feeder.
Should the interface instructions not be observed during the setting into operation, the
damaged elements as well as the resulting damages are not covered by warranty.
7.2. Universal interface diagram
The diagram shown below is called universal interface diagram.
If the lathe type is not specified, an universal interface will be offered with the bar feeder. The universal
interface diagram offers most of the signals which were connected to bar feeder interface terminals in
advance. During connection, the wires should be connected / removed according to the interface supplied
by the lathe.
With this situation, we strongly recommend the user to contact us for technical support.
Summary of Contents for Eco Load S2
Page 1: ...LNS SA 2534 Orvin Switzerland www LNS group com Instruction manual ENG 9 ECO 01 ...
Page 2: ......
Page 5: ...CHAPTER 1 BASIC NOTIONS 1 1 ECOLOAD S2 CHAPTER 1 BASIC NOTIONS ...
Page 12: ...1 8 CHAPTER 1 BASIC NOTIONS ECOLOAD S2 ...
Page 13: ...CHAPTER 2 TECHNICAL DATA 2 1 ECOLOAD S2 CHAPTER 2 TECHNICAL DATA ...
Page 17: ...CHAPTER 2 TECHNICAL DATA 2 5 ECOLOAD S2 2 3 Z axis retraction system ˋˆˊ ˊˋˊ ˌˊ ˉ ˁˈ ʳ ˆˇ ˈ ...
Page 19: ...CHAPTER 3 SETTING INTO OPERATION 3 1 ECOLOAD S2 CHAPTER 3 SETTING INTO OPERATION ...
Page 36: ...3 18 CHAPTER 3 SETTING INTO OPERATION ECOLOAD S2 ...
Page 37: ...CHAPTER 4 ELECTRICS 4 1 ECOLOAD S2 CHAPTER 4 ELECTRICS ...
Page 43: ...CHAPTER 4 ELECTRICS 4 7 ECOLOAD S2 4 2 Circuit diagram ...
Page 45: ...CHAPTER 4 ELECTRICS 4 9 ECOLOAD S2 5 2 PLC I O DIAGRAMS ...
Page 54: ...4 18 CHAPTER 4 ELECTRICS ECOLOAD S2 ...
Page 55: ...CHAPTER 5 PNEUMATICS 5 1 ECOLOAD S2 CHAPTER 5 PNEUMATICS ...
Page 57: ...CHAPTER 5 PNEUMATICS 5 3 ECOLOAD S2 2 PNEUMATIC CIRCUIT DIAGRAM ...
Page 62: ...5 8 CHAPTER 5 PNEUMATICS ECOLOAD S2 ...
Page 63: ...CHAPTER 6 GENERAL DESCRIPTION 6 1 ECOLOAD S2 CHAPTER 6 GENERAL DESCRIPTION ...
Page 77: ...CHAPTER 7 OPERATION 7 1 ECOLOAD S2 CHAPTER 7 OPERATION ...
Page 98: ...7 22 CHAPTER 7 OPERATION ECOLOAD S2 ...
Page 99: ...CHAPTER 8 TROUBLESHOOTING GUIDE 8 1 ECOLOAD S2 CHAPTER 8 TROUBLESHOOTING GUIDE ...
Page 109: ...CHAPTER 9 APPENDICES 9 1 ECOLOAD S2 CHAPTER 9 APPENDICES ...