CHAPTER 7: OPERATION
7-13
ECOLOAD S2
P03 Feeding length
This parameter should be MODIFIED if
production part changed.
The distance of bar stock needed to be fed for making a
part.
Position
Current pusher position (measured from home position).
Part Length
The needed feeding part length is :
< part length > + < cut off width >
P04 Pusher retract position 1 of 2
The pusher retracting DISTANCE to avoid its tip contacting
The pusher retraction
DISTANCE
to avoid its tip contacting
with rotating spindle.
Position
Current pusher position measured from home position SR3.
Return Stroke
The
DISTANCE
that the pusher should
RETRACT
so that it’s
tip does not contact the rotating bar stock.
Due to there is no rotating adapter between the pusher and the bar stock, the pusher tip must not contact
any rotating component or it will be damaged. Below is the summary for those cases and their solutions :
Direction Situation
Solution Parameter
Axial
The pusher touches the bar
stock rear end.
Keep the pusher away from the rotating
bar stock when feeding is accomplished.
P04
Lateral
The pusher touches the rotating
spindle because it’s own weight
droop it’s tip.
Keep the pusher behind the position
where its tip starts to droop to the rotating
spindle.
P02
P05 Top cut distance
Position
The distance which the tip of a new bar travels after it
touches the TOP CUT sensor.
Top cut
The position where the tip of a new bar will be positioned in
AUTO cycle.
Return Stroke
Top cut
Summary of Contents for Eco Load S2
Page 1: ...LNS SA 2534 Orvin Switzerland www LNS group com Instruction manual ENG 9 ECO 01 ...
Page 2: ......
Page 5: ...CHAPTER 1 BASIC NOTIONS 1 1 ECOLOAD S2 CHAPTER 1 BASIC NOTIONS ...
Page 12: ...1 8 CHAPTER 1 BASIC NOTIONS ECOLOAD S2 ...
Page 13: ...CHAPTER 2 TECHNICAL DATA 2 1 ECOLOAD S2 CHAPTER 2 TECHNICAL DATA ...
Page 17: ...CHAPTER 2 TECHNICAL DATA 2 5 ECOLOAD S2 2 3 Z axis retraction system ˋˆˊ ˊˋˊ ˌˊ ˉ ˁˈ ʳ ˆˇ ˈ ...
Page 19: ...CHAPTER 3 SETTING INTO OPERATION 3 1 ECOLOAD S2 CHAPTER 3 SETTING INTO OPERATION ...
Page 36: ...3 18 CHAPTER 3 SETTING INTO OPERATION ECOLOAD S2 ...
Page 37: ...CHAPTER 4 ELECTRICS 4 1 ECOLOAD S2 CHAPTER 4 ELECTRICS ...
Page 43: ...CHAPTER 4 ELECTRICS 4 7 ECOLOAD S2 4 2 Circuit diagram ...
Page 45: ...CHAPTER 4 ELECTRICS 4 9 ECOLOAD S2 5 2 PLC I O DIAGRAMS ...
Page 54: ...4 18 CHAPTER 4 ELECTRICS ECOLOAD S2 ...
Page 55: ...CHAPTER 5 PNEUMATICS 5 1 ECOLOAD S2 CHAPTER 5 PNEUMATICS ...
Page 57: ...CHAPTER 5 PNEUMATICS 5 3 ECOLOAD S2 2 PNEUMATIC CIRCUIT DIAGRAM ...
Page 62: ...5 8 CHAPTER 5 PNEUMATICS ECOLOAD S2 ...
Page 63: ...CHAPTER 6 GENERAL DESCRIPTION 6 1 ECOLOAD S2 CHAPTER 6 GENERAL DESCRIPTION ...
Page 77: ...CHAPTER 7 OPERATION 7 1 ECOLOAD S2 CHAPTER 7 OPERATION ...
Page 98: ...7 22 CHAPTER 7 OPERATION ECOLOAD S2 ...
Page 99: ...CHAPTER 8 TROUBLESHOOTING GUIDE 8 1 ECOLOAD S2 CHAPTER 8 TROUBLESHOOTING GUIDE ...
Page 109: ...CHAPTER 9 APPENDICES 9 1 ECOLOAD S2 CHAPTER 9 APPENDICES ...