Figure 2: Quick-release screws lid (open | close)
,
The gateway must be securely screwed to a wall/ceiling using
four suitable M4 screws and wall anchor, cf. red marking in
figure 3.
Figure 3: Housing measurements [mm]
,
When selecting the installation site, it is essential to ensure
that the specified ambient conditions (see Technical data) can
be maintained at all times.
,
The mounted pressure compensation element (9) increases the
total width of the gateway from 122 mm in figure 3 to a total
of 130 mm.
ð
The pressure compensation element (9) and the IP66 housing
protection class allow the gateway to be operated outdoors.
Simplified CE declaration
Lobaro GmbH hereby declares that the LOB-GW-HYB-
WMBUS is in compliance with Directives 2014/53/EU and
2011/65/EU. The full text of the EU Declaration of Confor-
mity is available at the following Internet address: