background image

4. Model WA-2700 & WA-1700 are designed with a reversible side 
cover plate for the by-pass openings.  Select the side to be used and 
insert one of the metal collars into opening and secure by bending 
tabs down.  Side cover plates are installed in opposite opening.

5.  Insert  two  (2)  top  mounting  screws  and  hang  main  body  of 
humidifier on plenum.  --  DO NOT TIGHTEN.

6.  Sighting  along  a  level  line,  select  a  location  for  the  connecting 
collar.    Using  the  collar  as  a  template,  scribe  a  circle.    Check 
diameter  before  cutting.    (7”  for  Model  WA-2700  and  6”  for  Model 
WA-1700.)  Use same cutting procedure.  Insert collar and secure by 
bending down tabs.

7.  Make  by-pass  connection  using  necessary  pipe  and  elbows  or 
flexible duct.  Insert two (2) bottom mounting screws.  Tighten all four 
(4) screws.

WATER SUPPLY

8.  Select  nearest  water  pipe.    Mount  saddle  valve  as  illustrated  in 
drawing  (See  Figure  4.)    Two  (2)  brass  ferrules  and  two  (2)  ¼” 
compression nuts are furnished to complete the connections at the 
saddle valve and the unit.  The installer will furnish the necessary 
length of ¼” water inlet tubing.

INTRODUCTION

• LOBB Power Humidifiers are the most versatile, “common sense” 
designed  humidifiers  on  the  market  today.    They  offer  you,  the 
homeowner, the most trouble-free, high capacity  power humidifiers 
yet built.  Based on the proven high efficiency of the rotating drum 
principle,  these  units  deliver  controlled  pure  water  vapor  into  the 
home up to 18 gallons per day.
• 

OPERATING PRINCIPLE:

  Evaporation takes place as the heated 

air from your furnace passes through the moisture laden evaporative 
pad.  This pad, is wetted as it slowly rotates in a float controlled level 
of water.  The moistened warm air is then passed on into the duct 
system.
•  The  operating  principle  is  exactly  the  same  on  all  LOBB  Power 
Humidifier models.  Your LOBB Humidifier housing is manufactured 
of  the  highest  quality  non-corrosive,  easily  cleaned  fiberglass.    All 
component  parts,  except  pad  and  pan  liner  are  warranted  for  two 
years.
•  Given  the  necessary  maintenance,  your  LOBB  Humidifier  will 
provide many years of trouble-free performance and the comfort of 
adequate and controlled indoor relative humidity.  Carefully read the 
instructions enclosed in the Homeowners Manual on caring for your 
new LOBB Power Humidifier.

INSTALLATION INSTRUCTIONS
FOR MODELS WA-2700 & WA-1700
POWER HUMIDIFIERS

1.  Both  Models  WA-2700  and  WA-1700  are  designed  to  allow 
mounting  on  either  the  warm  air  plenum  of  the  return  air  plenum.  
Select  a  location  on  either  plenum  that  will  allow  easy  access  for 
cleaning and servicing.  NOTE:  When a cooling coil for central air 
conditioning is involved, caution should be taken to insure “tapping 
in” where there is any restriction of air-flow to the humidifier. (See 
Figure 1.)

IMPORTANT: It is the responsibility of the INSTALLER to insure that 
the  installation  is  made  in  accordance  with  local  codes,  and  in  a 
manner that does not conflict with warranties on other equipment.

PROPER APPLICATIONS OF
MODEL WA-2700 & WA-1700

2. When mounting position has been located on the plenum, scribe a 
level  line  12”  up  from  the  top  of  the  furnace.    Place  edge  of  the 
pressure sensitive template on the scribed line and smooth out.

3.  Center  punch  the  four  (4)  holes  as  indicated  for  model  being 
installed, and drill 1/8” holes.  Using a heavy screw driver or chisel 
and  hammer,  slash  starting  hole  in  the  center  of  cutting  line  on 
template.  Insert shears and cut to line and follow outline for opening.  
Remove remainder of template.  (See Figure 2.)

2.

5.

6.

3.

4.

9.  Insert  the  rotating  drum.    The  LOBB  WA-2700  and  WA-1700 
Humidifiers are designed to insert or remove the drum from either 
top or bottom of unit.

10. A.  Attach water pan on WA-2700 with stainless steel pan clips.  
Clips are applied with dimpled side up into molded slot and locked in 
position by sliding ¼” toward back of unit.

10. B.  Attach water pan on WA-1700 by inserting pan so that molded 
lips on rear of pan lock into rear bar on case – secure by use of brass 
holding screw in front.

11. 

Water Level Adjustment- If necessary

With pan in place, open water supply saddle valve. To adjust water 
level,  loosen  turn  thumb  screw  and  adjust  float  arm  up  or  down. 
Move float arm up to increase water level, or move it down to lower 
the water level. Tighten thumb screw after adjustment. Water level 
should be approximately ½” below the upper edge of the pan liner.

Do Not Overtighten Thumb Screw!

WIRING – 24 VOLT

1.  All  wiring  must  comply  with  local  codes  and  ordinances.    See 
diagrams below.  (Other optional diagrams are shown in humidistat 
instructions.)

NOTE:  Necessary low voltage wire to be provided by installer.

NOTE:  Air flow switch can be located ahead of transformer when 
electronic air cleaner is also to be controlled.

2. Set furnace controls so that fan is running.  Turn humidistat to “ON” 
–  Humidifier  should  run.    Set  furnace  controls  so  that  fan  stops  – 
Humidifier should stop.

3. Set furnace controls and humidistat to desired condition (35% is 
recommended).  The humidifier will operate automatically.

FIG.  A.

  Typical  wiring 

diagram  for  system  with 
single 

speed 

blower 

motor.

FIG.  B.

  Typical  wiring 

diagram for systems with 
multi-speed  blower  or 
when  power  source  is 
external 

to 

furnace 

system.

Power Humidifiers

Installation and

Operation Instructions

723 S. Route 31 • West Dundee, IL 60118

(248)623-0222

Fax (248)623-0445

Website • www.lobbair.com

WA-2700

Plenum Type

WA-1700

Plenum Type

®

P/N 522-1

Thumb

Screw

Float

Arm

Water

Float

Water

Inlet Line

Pan

Liner

Figure 5

Reviews: