background image

Lobb WS-3300 Installation Instructions

Attention Installer:  Read Complete Safety and Installation Instructions Before Starting.

Introduction

The Lobb WS-3300 is the most efficient flo-thru whole 
house  humidifier  you  could  have  chosen  to  install.    It 
uses  75%  less  water  that  other  comparable  flo-thru 
models on the market today.

Installation Instructions

1. It is recommended that the WS-3300 be installed on 
the return air plenum.  However, if this is not accessible, 
the warm air plenum can be used.  Select a spot on the 
plenum  that  allows  for  easy  access  when  service  or 
maintenance is required.

2.  Draw  a  level  line  for  the  template  on  the  furnace 
plenum.    Make  sure  the  bottom  of  the  template  is  at 
least  3  inches  above  the  furnace  jacket  for  the  water 
supply line and drain hose.  Place mounting template in 
position, making sure it is level.  See sketch #726.

3. Drill the four (4) mounting hole locations.  They are 
marked with a +.  Cut the inside opening of the mounting 
template, leaving the outside lines visible.  Be careful to 
avoid injury from sharp edges.  See sketch #726

4. Remove the top cover of the WS-3300 and set aside.  
Lift front of distribution tray and remove evaporator pad 
first, then remove distribution tray.

5. Carefully place the WS-3300 cabinet into the opening 
in  the  plenum.    Insert  the  4  mounting  screws  into  the 
holes and tighten the cabinet to the plenum.

Make the by-pass connection using the necessary hard 
pipe and elbows or flex duct.

6.  The  WS-3300  is  designed  with  a  reversible  side 
cover  plate  for  the  by-pass  opening.    Carefully  select 
the  location  for  the  by-pass  connection,  and  install  a 
snap-in  collar.    Secure  side  cover  plate  on  opposite 
opening with nut and bolt provided.

7. Re-install distribution tray.  Lift the front on the distri-
bution  tray,  slide  evaporator  pad  into  position,  then 
lower  distribution  tray  on  top  of  the  evaporator  pad.  
Sculptured bottom of evaporator pad should fit into pan 
liner.

8. Select the nearest water pipe, to install the water line 
to the humidifier.  Tap into the water supply line with the 
self-tapping saddle valve furnished.  The saddle valve 
must be completely open or closed.  Connect an appro-
priate  length  of  ¼”  plastic-poly  tubing  (not  supplied) 
and connect it from the saddle valve to the inlet side of 
the solenoid.  A hard water line is preferred.

Use of copper tube voids warranty

9. Install the humidistat per instructions provided with 
the humidistat.  The general rules for the installation of 
thermostats also apply to the humidifier.

10. Wiring – 24 volts.  All wiring must comply with local 
codes and ordinances.  Shut off the furnace power and 
locate the blower motor junction box.  Mount the 24 volt 
transformer  on  the  box  and  tap  the  primary  120  volt 
leads to the motor wires.  Wire the solenoid in series 
with  the  24  volt  terminals  on  the  transformer  and 
humidistat.  See the wiring diagram below.

11. Attach ½ inch I.D. PVC pipe or plastic tubing from 
the WS-3300 drain at the bottom of the cabinet to the 
nearest floor drain.  Make sure the drain pipe is draining 
properly and has continuous slope with no traps.  PVC 
is recommended, however, ½ inch I.D. plastic hose can 
be used as long as there is proper slope with no traps.

Reviews: