100221773_2000189439_Rev. 01
www. lochinvar .com
37
INSTALLATION CHECKLIST
Note:
Use and complete this checklist before lighting the
heater. Correct any conditions that do not meet these
instructions.
Water Heater Location
Centrally located with the water piping system.
Located as close to gas piping and vent pipe system
as possible.
Located indoors and in a vertical position. Protected
from freezing temperatures.
Proper clearances from combustible surfaces main-
tained and not installed directly on a carpeted floor.
Provisions made to protect the area from water
damage. Metal drain pan installed and piped to an
adequate drain.
Installation area free of corrosive elements and flam-
mable material.
Sufficient room to service the water heater.
Gas Supply and Piping
Gas supply is the same type as listed on the water
heater data plate.
Gas line equipped with shut-off valve, union and dirt
leg
Approved pipe joint compound used.
Adequate pipe size and of approved material.
Chloride-free soap and water solution or other
approved means used to check all connections and
fittings for possible gas leaks.
Vent Pipe System
Vent pipe and fittings of approved material.
Acceptable size, length and number of elbows on
exhaust vent system.
Installed in accordance with prevailing provisions
of local codes, or in the absence of such, the latest
edition of
“National Fuel Gas Code”, ANSI Z223.1/
NFPA 54
.
Horizontal piping slopes at an upward pitch of 1/8 in.
rise per 4 ft. away from the water heater.
Not obstructed in any way.
Venting properly supported and able to move freely
for expansion and contraction.
Condensate drain connected as required.
Vent Termination
Horizontal
12” min. above grade/snow level.
Away from corners, other vents, windows etc.
Correct termination screen installed and secured.
Vertical
Exhaust vent termination 18” min. above roof/snow
level.
Correct termination screen installed and secured.
Water System Piping
Temperature and Pressure relief valve properly
installed with a discharge line run to an open drain
and protected from freezing.
All piping properly installed and free of leaks.
Heater completely filled with water.
Closed system pressure build-up precautions
installed.
All components used in combo heating systems or
recirculation loop systems suitable for potable water.
Check valves installed in combo heating and recircu-
lation loop systems.
Electrical Connections
Unit connected to a (preferably dedicated) 120V
electrical supply.
Proper polarity.
Water heater properly grounded.
Electrical outlet is NOT a GFI outlet.
Installed in accordance with prevailing provisions
of local codes, or in the absence of such, the latest
edition of
“National Electrical Code” (NFPA 70)”
.
After all actions on checklist are checked/
completed, read the Lighting Instructions and
proceed with lighting the heater.