54
SHW35-245CE
–
SHW86-410CE
1.
Remove the front access cover from the unit.
2.
Remove the impulse tube and wiring plug from the gas valve.
3.
Remove the four
screws securing the gas valve to the venturi (Figure 16.2.3).
4.
Locate the propane orifice disk from the conversion kit bag. Verify that the stamping on the orifice disk is correct for the water heater
(see Table 16.2.1). Place the orifice into the black rubber grommet in the front of the gas valve ensuring the orifice and grommet are
seated correctly (Figure 16.2.3).
5.
Reposition the gas valve against the venturi and replace the screws (Figure 16.2.3) securing the valve to the venturi.
6.
Refit the impulse tube and wiring plug to the gas valve.
7.
After installation is complete, attach the propane conversion label (in the conversion kit bag) next to the water heater rating plate.
Attach the LP caution label (in the conversion kit bag) to the left side of the unit in the lower left corner.
8.
Replace the front access cover.
CONVERSION
PROCEDURE
SHW35-2455CE
–
SHW86-410CE
SHW116-410CE
1.
Remove the front access cover
from the unit.
2.
Remove the impulse tube and wiring plug from the gas valve.
3.
Remove the three screws securing the venturi to the fan.
NOTE: When separating the venturi from the fan, take care not to damage the O-ring inside the fan (
Figure 16.2.5
4.
Remove the four cap-head screws securing the gas valve to the venturi (
Figure 16.2.5
5.
Locate the propane orifice disk from the conversion kit bag. Verify that the stamping on the orifice disk is correct for the water heater
(see
Table 16.2.1LPG ORIFICE MARKING
).
6.
Remove the existing orifice from the O-ring in the side of the gas valve and replace it with the orifice from the kit. Position and secure
the orifice in the valve as shown in
Figure 16.2.5
7.
Reposition the gas valve against the venturi and replace the star-drive screws (
Figure 16.2.5
) securing the valve to the venturi.
8.
Inspect the O-ring inside the fan. Handle the O-ring with care, do not damage. Reposition the venturi against the fan and replace the
screws securing the venturi to the fan (
Figure 16.2.5
9.
Refit the impulse tube and wiring plug to the gas valve.
10.
After installation is complete, attach the propane conversion label (in the conversion kit bag) next to the water heater rating plate.
Attach the LP caution label (in the conversion kit bag) to the left side of the unit in the lower left corner.
11.
Replace the
front access cover
.
Summary of Contents for EcoShield SHW116-410CE
Page 2: ...2 ...
Page 9: ...9 EXPLODED VIEW DRAWINGS ...
Page 27: ...27 Max distance between brackets ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 34: ...34 ...
Page 47: ...47 13 9 LADDER DIAGRAM LADDER DIAGRAM ...
Page 71: ...71 NOTES ...
Page 72: ...72 N ...