9
Installation & Operation Manual
1
Determine boiler location
(continued)
12"
(305 MM)
LEFT
13" (330 MM)
TOP
1" (25 MM) MINIMUM CLEARANCE
AROUND HOT WATER
PIPES AND VENT PIPE
14" (356 MM)
REAR
18" (457 MM)
FRONT
0"
RIGHT
OPEN
FRONT
ALCOVE INSTALLATION
Figure 1-2
Alcove Installation - Minimum Required Clearances
6" (152 MM)
13" (330 MM)
TOP
CLOSET INSTALLATION
1" (25 MM) MINIMUM CLEARANCE
AROUND HOT WATER
PIPES AND VENT PIPE
VENTILATING*
AIR OPENING
CLOSED DOOR
VENTILATING*
AIR OPENING
0"
RIGHT
6" (152 MM)
F RONT
14" (356 MM)
REAR
12" (305 MM)
LEFT
*AREA OF EACH OPENING:
1 SQ. INCH PER 1000 BTU PER HOUR INPUT
WITH A MINIMUM OF 100 SQ. INCHES
Figure 1-1
Closet Installation - Minimum Required Clearances
WARNING
For closet installations, CPVC or
stainless steel material MUST BE
used in a closet structure due to
elevated temperatures. Failure to
follow this warning could result in
fire, personal injury, or death.
RECOMMENDED SERVICE CLEARANCES:
Front
- 30" (762 mm)
Top
- 24" (610 mm)
Left Side - 24" (610 mm)
Rear -
24" (610 mm)
RECOMMENDED SERVICE CLEARANCES:
Front
- 30" (762 mm)
Top
- 24" (610 mm)
Left Side - 24" (610 mm)
Rear -
24" (610 mm)
WARNING
For alcove installations, CPVC or
stainless steel material MUST BE
used in an alcove structure due to
elevated temperatures. Failure to
follow this warning could result in
fire, personal injury, or death.