Assembly- and Installation
Instructions
Lohberger Heiztechnik
GmbH
N28/HB N28/GB
Seite 8
Lohberger Heiztechnik GmbH, A-5020 Salzburg-Bergheim, Rechtes Salzachufer 40
Tel. 0662-450444-0, Fax-DW 9
Es gelten unsere aktuellen allgemeinen Geschäftsbedingungen. Irrtum, Druckfehler und technische Änderungen vorbehalten
3.1
TDA components
components
Casing
Control unit (circuit
board)
Filling door
Induced draught fan
Autom. heat-
exchange cleaning
Control panel
Pellet combustion
chamber
Ignition element
Pellet insertion channel
Primary air flap
Ash box
Ash pan
Ash pan lever
Control
unit/circuit
board
All data is saved on the circuit board. All operational sequences are
coordinated via the control unit/circuit board.
Control panel:
The entire system is operated via the control panel.
Autom.
heat-
exchange cleaning:
The automatic heat exchang cleaning cleans the heat exchanger
tubes with cleaning spirals in certain cycles.
Filling door:
The filling door must only be opend for cleaning purposes.
Pellet
combustion
chamber:
In the pellet combustion chamber the pellets are burnt.
Pellets
insertion
channel:
Serves to supply pellets to the pellets combustion chamber.
Ignition element:
The ignition element ensures automatic ignition of the pel-
lets/logwood.
Primary air flap:
The primary air required for combustion flows through the primary air
flap.
Secondary air flap:
(not visible)
The secondary air required for combustion flows through the second-
ary air flap.
Ash pan:
To get to the ash boxes, the ash pan lever must be in the up position,
then the ash pan can be pulled out with the ash boxes.
Ash box:
All unburnt material is collected in the ash box
Induced draught fan:
Serves to supply air to the boiler.