Installation
43
Receiving and Unpacking
Receiving the machine
On receipt of your Loma inspection machine, we recommend that you check the external
packing for any signs of damage.
If the external packaging is damaged do not refuse the shipment but make a notation on the
carriers delivery receipt and take pictures of the packaging damage.
When moving the machine, please follow the guidance included in the
Moving the Machine
section.
Unpacking the machine
Remove all packing and retain in case the machine has to be repacked for return.
If on unpacking the machine it is subsequently found to be damaged, take further pictures of
the damage and send them to Loma Systems. Loma Systems will then carry out an
investigation, including a review of the applicable carriage terms / Incoterms, to decide what
action is to be taken.
Wheels (if fitted) are screwed fully in and are locked (UK only), or supplied in a polythene
bag which is placed inside the reject bin (Europe). Remove them from the reject bin and
remove the packing material. Then fit the wheels to the out rigged legs of the machine frame.
You may need to raise the machine to fit the wheels so please follow the guidance included
in the
Moving the Machine
section.
Feet may have been fitted for transit purposes or 20 mm bolts may be used to secure the
machine to a pallet. Conveyors for customers in Europe may have been secured to the pallet
by 20 mm bolts which are screwed into the underside of the legs. Remove these bolts if
fitted. You may need to raise the machine to remove the transit bolts and fit the feet so
please follow the guidance included in the Moving the Machine section.
Removing Bolts and Fitting Wheels
Conveyors for customers in Europe may have been secured to the pallet by 20 mm bolts
which are screwed into the underside of the legs. Remove these bolts if fitted
If wheels have been supplied for the conveyor, remove them from the reject bin and remove
the packing material. Fit the wheels to the outrigged legs of the conveyor. This is best done
when the system has been raised up to take the weight off of the legs and allow room to
screw in the wheels.
Moving the Machine
Depending on the size and weight of the machine, either a crane or a fork-lift truck will be required to
lift and move it into the final location.
When a machine fitted with wheels is to be pushed on the wheels, it is important that it is moved
carefully. Avoid hitting obstacles with the wheels as this can damage the plastic wheel inserts inside
the legs.
Using a Crane
Position the straps under the frame and around the machine so that it will not tilt when lifted.
Then attach the straps to the crane.
Lift the machine carefully and move it to the required location.
Lower the machine and remove the straps.
Do not attempt to lift or move a machine by a reject cover as they are easily damaged.
Using a Fork Lift Truck
A machine tends to be top heavy so may topple forwards when lifted. For this reason it is
advised that the machine is positioned on the forks with the front of the machine facing
backwards.
Raise the forks sufficiently to lift the machine clear of the ground and any obstacles.
Summary of Contents for IQ3+ST
Page 2: ......
Page 36: ...Safety First 26 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 43: ...Installation 33 ...
Page 60: ...Installation 50 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 70: ...About the Metal Detector Range 60 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 172: ......
Page 212: ...Operating Instructions 202 THIS IS PAGE INTENTIONALLY LEFT BLANK ...
Page 240: ...Maintenance 230 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 244: ...Glossary 234 THIS PAGE IS INTENTIONALLY LEFT BLANK ...