29
Installation
This chapter provides generic information covering the installation of the Loma IQ
3
+ Metal Detector in
a logical sequence, both as a head only and as a system with the head fitted to a Loma conveyor.
The following sections provide more information:
■
Installing a Metal Detector Head
Provides guidance for installing a metal detector head only.
■
Installing a Metal Detector System
Provides guidance for installing a metal detector system, consisting of a metal detector head
fitted to a Loma conveyor and including standard and optional equipment.
■
Site Considerations
All Loma machines are designed and tested against recognised international standards for
Electromagnetic Compatibility, to operate under factory conditions. This section provides further
information on the impact of RF interference.
Installing a Metal Detector Head
This section provides information covering the installation of a Loma IQ
3
+ Metal Detector Head in a
logical sequence.
The following sub-sections provide more information:
■
Warnings
A list of applicable
safety warnings
to be observed when installing the metal detector head is
provided.
■
Receiving and Unpacking
Some basic checks should be carried out on receipt of the machine to ensure that it has not
been damaged in transit.
■
Moving the Detector Head
Depending on the size and weight of the detector head, either a crane or a fork-lift truck will be
required to lift and move it into the final location. This section provides some guidance for
moving the machine safely.
■
Detector Head Mounting Positions
Diagrams are included to provide details for mounting detector heads in different positions.
■
Mounting a Detector Head onto a Conveyor
There are a number of points to consider when fitting a new Loma Metal Detector head to an
existing conveyor of whatever manufacture, or when building a new conveyor to incorporate a
metal detector head. This section provides some guidance.
■
Connecting the Detector Head Electrical Supply
This section provides guidance on connecting an electrical supply to the detector head.
Summary of Contents for IQ3+
Page 2: ......
Page 36: ...Safety First 26 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 43: ...Installation 33 ...
Page 60: ...Installation 50 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 70: ...About the Metal Detector Range 60 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 218: ...Operating Instructions 208 THIS IS PAGE INTENTIONALLY LEFT BLANK ...
Page 244: ...Maintenance 234 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 248: ...Glossary 238 THIS PAGE IS INTENTIONALLY LEFT BLANK ...