Installation
47
To connect an electrical supply, proceed as follows:
1.
Unlock and open the Electrical Services Box to access the electrical services.
2.
The back of the Isolator Switch is located in the bottom right hand side of the cabinet
when viewed from the rear. Beneath it on the bottom of the cabinet is the cable gland
access for the power cable.
3.
Push the supply cable up into the Electrical Services Box through the cable gland.
4.
Split the cable inside the box and cut the wires to suitable lengths. An armoured/braided
cable is recommended when cable conduit is not used. A suitable earth conductor is
also to be fitted.
5.
Crimp connectors onto the wires and connect to the Isolator Switch as specified in the
table below.
6.
Check that all connections are secure then refit the metal cover plate and front cover.
The supply to the conveyor must be either 5-core cable (3-core cable is suitable for single
phase machines) fed through a flexible conduit or 5-core armoured cable . Insert the cable
through the gland.
Do not use rigid conduit of any type. Rigid conduit can lead to vibration being transmitted to
other components, resulting in spurious triggering / rejects.
Cable Connections
3-Phase, Earth and Neutral
Core
Terminal
3-phases
L1, L2 and L3
Neutral
N
Earth
E
3-Phase, Earth, No Neutral
Core
Terminal
3-phases
L1, L2 and L3
Neutral
Not used
Earth
E
1-Phase, Earth and Neutral
Core
Terminal
1-phase
L1
Neutral
N
Earth
E
Summary of Contents for IQ3+
Page 2: ......
Page 36: ...Safety First 26 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 43: ...Installation 33 ...
Page 60: ...Installation 50 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 70: ...About the Metal Detector Range 60 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 218: ...Operating Instructions 208 THIS IS PAGE INTENTIONALLY LEFT BLANK ...
Page 244: ...Maintenance 234 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 248: ...Glossary 238 THIS PAGE IS INTENTIONALLY LEFT BLANK ...