WULFSBURG C-5000 INSTRUCTION SHEET
STEP 5 POWER UP UNIT:
ONCE THE C-5000 IS INSTALLED INTO THE DOCKING STATION YOU
ARE READY TO POWER -UP THE STATION AND CONTROL HEAD.
FIRST:
TOGGLE THE DOCKING STATION’s
ON/OFF SWITCH
TO THE OFF
POSITION.
SECOND:
PLUG THE AC CORD INTO THE DOCKING STATION’s AC INLET RECEPTACLE
THEN INTO AN
AC GROUNDED
POWER SOURCE.
THIRD:
MAKE SURE THE C-5000 ON/OFF SWITCH IS IN THE OFF POSITION
.
FORTH:
I
NSERT THE ( 8 PIN DIN ) POWER CABLE ASSEMBLY INTO THE 8 PIN DIN ROUND FEMALE
RECEPTACLE ON THE DOCKING STATION’s BACK ACCESSORY PANEL. CONNECT THE
GRAY FEMALE MULTI- PIN (62) PIN db CABLE ASSEMBLY INTO THE TOP P500 (62) PIN
MALE CONNECTOR ON THE REAR OF THE C-5000 CONTROL HEAD.
FIFTH:
TURN THE DOCKING STATION’s ON/OFF SWITCH TO THE ON POSITION.
SIXTH:
TURN THE C-5000 POWER SWITCH TO THE ON POSITION. THE DOCKING STATION’s
POWER SUPPLY TAKES (4) SECONDS TO REACH FULL POWER. THE RED LED INDICATES
DC POWER IS ACTIVE FROM THE POWER SUPPLY, THROUGH THE FUSE ASSEMBLY TO
THE 8 PIN POWER CABLE.
STEP 6 CONTROL HEAD OPERATIONS:
FOR GENERAL OPERATING INSTRUCTIONS, TRAINING, OR PROGRAMMING
REFER TO YOUR OWNER’s MANUAL, PILOTS GUIDE, OR SERVICE INSTALL
DOCUMENTATION.
1. TRAINING - INITIAL-BASIC-TO ADVANCED OPERATIONS.
2. CONTROL HEAD- PROGRAMMING- UP TO 350 CHANNELS- 99 SCAN GROUPS.
3. FIRMWARE UPGRADES / SYSTEM VERIFICATION CHECKS.
STEP 7 DOCKING STATION MAINTENANCE:
1. FUSE REPLACEMENT - REPLACE WITH 2 AMP FUSE - 1.25 X .025 FAST BLOW.
2. CLEANING - CLEAN WITH ALCOHOL.
3. POWER SUPPLY - N/A
4. CONNECTOR - N/A
STEP 8 PELICAN CASE:
THE 1550 PELICAN CASE HAS SEVERAL OPENINGS FOR VARIOUS
PRODUCTS, ONE BEING THE C-5000 CONTROL HEAD. THE TOP
INCORPORATES AN OPENING FOR A 1/2/ MANUAL. THE BOTTOM SECTION HAS
(2) TRIANGULAR SHAPES FOR CABLES,
ADAPTERS, ETC. THE PREDOMINATE
OPEN AREA HAS BEEN SPECIFIED FOR YOUR SPECIFIC EQUIPMENT.
OFF
ON
REVISION 7-15-05 PRINTED IN USA
LONE STAR AVIATION CORP.
•
604 S. WISTERIA
•
MANSFIELD, TEXAS 76063
•
1-682-518-8882 or 1-682-518-8831- FAX