82
The common shovel-loading method is suitable for the loading of bulk materials.
Make the loader approach the materials at Forward Gear 2, align the middle portion
of the bucket with the material pile, hold the steering wheel with your left hand, and
operate the working device joystick with your right hand so as to lower the boom to
the position which is 500mm above the ground.
When the loader is about one meter away from the material pile, lower the boom
again and make the bucket contact with the ground, and then change the forward
gear 2 to forward gear 1.
NOTE: When making the bucket contact with the ground, be sure not to make
the bucket apply a too large force onto the ground, otherwise the unnecessary
travelling resistance may occur. In addition, the front/rear frames of the loader
shall be placed straightly, and there must be no included angle between front
and rear frames.
Step down the accelerator pedal so as to insert the bucket into the material pile with
full force; when the loader can’t move forward any more, push leftwards the working
device joystick so as to turn the bucket backwards, and then pull the joystick to the
middle position. In this way, the loader may go ahead into the material pile. Repeat
the operation mentioned above until the bucket is filled with the material.
Combined shovel-loading method
The combined shovel-loading method is suitable for loading relatively hard or sticky
materials. Before the bucket is inserted into the materials, all operations are the same
as those of common shovel-loading method. When the bucket can’t move forwards
any more after being inserted into the material pile, just pull backwards the working
device joystick with your right hand and then push it to the middle position, so as to lift
up the bucket for once. In this way, the bucket may go ahead for certain distance.
Thereafter, push leftwards the working device joystick and then push it to the middle
position, so as to turn backwards the bucket for once. In this way, the bucket may get
further inserted into the material pile. Repeat the operation “insertion, lifting, inserting
and turning” until the bucket is filled with materials.
Exiting from material pile
After the bucket is filled with materials, just operate the working device joystick so as
to turn backwards the bucket until the stopper on the bucket contacts with the boom,
and then push the control handle to the middle position. Now the maximum rollback
angle is obtained.
Raise the boom to a certain height, so as to ensure that the bucket may evade the
material pile when the loader is travelling backwards. Just hold the steering wheel
with your right hand, and pull backwards the gear shifting joystick to the reverse gear
position with your left hand, so as to make the loader travel backwards.
After the loader exits from the material pile, just operate the working device joystick