86
Figure: Shuttling Work Method
4.5TRANSPORTATION OF LOADER
Before the transportation, be sure to survey the height, width and permissible load of the
transportation course. The total height, total width and total weight after the loader is
placed on the transportation vehicle may not exceed the specified value. If the height or
width exceeds the specified value, please consult with Shanghai LONKING Machinery
Co., Ltd. or its distributor for solution.
In order to prevent the safety accident caused by unexpected movement or sliding of the
loader in the course of transportation, be sure to clear away ice, snow and other slippery
materials on the dock or vehicle before the transportation.
NOTE: When transporting the loader, please comply with the national or local
regulations relating to height, width, length and weight.
Please carry out the transportation in accordance with the following procedure:
1
Before the transportation, be sure to block up the wheels of the towing tractor or truck
with chock (towing tractor in the figure).
Figure: Use Chock to Block up the Wheels of the
Towing Tractor
2. After the loader has driven onto the towing tractor or truck, no turning operation may
be carried out in the course of transportation. If it is necessary to carry out turning
operation, please carry out the operation only after the loader has returned to flat
ground.
3. After the loader is parked properly, use the frame fixing rod to fix the front/rear frames.