8
Installation
(for qualified installers only)
© Travis Industries
4101110
100-01262_000
Packing List
•
Propane Conversion Kit
• Touch-Up
Paint
•
½” FPT to 3/8” Flare Fitting
•
Rear Vent Cover
•
Driftwood/Stone Conversion Parts
Additional Items Required
•
Vent (see “Venting Requirements” for details)
•
Gas Line Equipment (shutoff valve, pipe, etc.)
•
Approved Travis Media (Logs 94500561, Driftwood
94500562, or Stones 94700733)
Installation Overview
See "Vent
Requirements"
See "Floor
Protection
Requirements"
See "Gas Line
Installation"
See
"Clearances"
Installation Hints:
•
Recommended Optional Equipment Installation Order:
-- Rear Vent Conversion (if applicable)
-- GreenSmart Remote
-- Blower Standard
-- LP Conversion and other optional equipment (fireback)
•
Install the media (logs, driftwood, or stone set) last - they are fragile.
•
When determining the location of the stove, locate the wall studs (for horizontal penetrations) and
ceiling trusses (for vertical penetrations). You may wish to adjust the stove position slightly to ensure
the vent does not intersect with a framing member.
•
Fumes and smoke from the paint curing and oil burning off the steel may occur the first time you start
this heater. This is normal. We recommend you open windows to vent the room.