S15
Pre-Installation and Site Preparation Guide
1008236 Rev B
Loring Smart Roast Proprietary – This document is controlled by
Document Control. By printing this document, it will become a “Reference” copy.
Users are responsible for verifying that it is the latest revision available.
Page 31 of 46
Lifting and Moving the Roaster
Off-Loading
Transporting
6' Fork Extensions
Use pallet jack for smooth
surfaces
Use forklift for uneven ground
with level changes
6'
Use forklift rated for
weight of crate + pallet