MAINTENANCE SCHEDULE
TURN MACHINE OFF BEFORE PERFORMING ANY
MAINTENANCE.
ELECTRICAL
CHECK MONTHLY:
1. INSPECT FOR LOOSE WIRES THROUGHOUT THE MACHINE AND INSIDE
THE PANEL BOX.
2. INSPECT FOR MOISTURE INSIDE THE PANEL BOX.
3. CLEAN LENS ON PHOTOCELL.
PNEUMATIC
CHECK WEEKLY:
1. INSPECT AIR FILTER AND DRAIN IF NECESSARY. WATER IN THE AIR
LINES WILL CAUSE THE MACHINE TO ERRATICALLY CYCLE AND ALSO
GUM UP THE SOLENOID VALVES.
2. INSPECT AND CLEAR THE VACUUM GENERATORS.
3. INSPECT THE COMPONENTS AND THE AIR LINES FOR LEAKS. LOSS OF
AIR MEANS LOSS OF SPEED AND EFFICIENCY.
4. INSPECT THE VACUUM CUPS FOR CRACKS OR TEARS. (EVEN IF ONLY
(1) VACUUM CUP IS DAMAGED, TOTAL VACUUM WILL BE LOST FOR THE
COMPLETE SYSTEM.)
5. CHECK THAT VACUUM LINES ARE FREE FROM DEBRIS.
6. CHECK THAT REGULATOR IS SET TO 80 PSI.
Summary of Contents for CASEFORM 40
Page 25: ......
Page 27: ......
Page 29: ......
Page 31: ......
Page 33: ......
Page 35: ......
Page 37: ......
Page 39: ......
Page 41: ......
Page 43: ......
Page 45: ......
Page 47: ......
Page 49: ......
Page 51: ......
Page 53: ......
Page 55: ......
Page 57: ......
Page 59: ......
Page 61: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......