INSTALLATION PROCEDURE
Exercise care when handling this machine. a sudden jolt or jar may cause serious
damage.
Do not remove the shipping skid until machine has been moved to a point of
installation. The skid is designed for easy and safe handling of your machine.
Raise or lower the machine to the desired operating elevation using the leveling jack
screws and level the machine.
A great deal of trouble may be caused if the current is supplied by lines which are
not heavy enough. if this occurs, the motors and controls cannot operate at their full
capacity and over heating may result. A similar condition will exist if poor electrical
connections are made. It's therefore worthwhile to make sure that everything is
electrically correct.
Electrical polarity must be supplied to the machine exactly as shown on the electrical
diagram. Power must be supplied to L1 side of the circuit and the L2 side will be
neutral. If this is not correct, the circuit protectors (ECP 1) will trip out because of a
short circuit.
The air to the machine should be clean and dry, as the filter is only meant to remove
minor particles or slight amounts of moisture. Dirt or moisture in the air line can
cause the erratic operation of control valves.
Connect the air supply to an air source with a minimum line pressure of 80 PSI.
Before starting the machine, load the tape cartridge with tape and thread the tape.
See threading diagram on tape unit.
For proper start-up procedure see the start-up procedure section of this manual.
Summary of Contents for CASEFORM 40
Page 25: ......
Page 27: ......
Page 29: ......
Page 31: ......
Page 33: ......
Page 35: ......
Page 37: ......
Page 39: ......
Page 41: ......
Page 43: ......
Page 45: ......
Page 47: ......
Page 49: ......
Page 51: ......
Page 53: ......
Page 55: ......
Page 57: ......
Page 59: ......
Page 61: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......