2-3:   Selecting installation position 

 

It is necessary to select a proper environment to install the unit, to minimize the possibility of damage to the 

battery box and extend the life of the batteries. Please follow the instructions below:  

• 

Keep at least 20cm (8 inches} clearance from the rear panel of the unit from the wall or other 
obstructions.  

• 

Do not block the airflow to the ventilation openings of the unit.  

• 

Please ensure the installation site environmental conditions are in accordance with the unit's working 
specifications to avoid overheat and excessive moisture.  

• 

Do not place the unit in a dusty or corrosive environment or near flammable objects.  

• 

This unit is not designed for outdoor use.  

This unit can either be mounted or placed vertically on the desk.  

  

Rack installation:  

Step 1:

  

Mount the 4-point rail kit to the rack. Use the (8) 10-32 screws provided to mount left and right support 

rails (front and rear).

  

 

Step 2:

  

Attach the mounting brackets to the UPS. 

CAUTION

—DO NOT use mounting brackets to lift the UPS; 

brackets are only to secure it to the rack. 

 

Step 3:  Place UPS on the support rails and secure in place with front screws, allowing the horizontal rails to 
support the weight of the UPS.

 

  

 

 

 
 

Summary of Contents for UPS-XBPA Series

Page 1: ...2021 Lowell Manufacturing Co X Rev 10 21 21 1 UPS XBPA Series Expansion Battery Pack Models UPS XBPA 36 UPS XBPA 36E UPS XBPA 48 UPS XBPA 72 User Installation Manual power TM...

Page 2: ...1 2 Table of Contents 1 Important Safety Warnings 3 2 Product Overview Setup 4 a Rack installation 5 b Tower installation 6 c Connecting UPS with another Battery Box 6 3 Type of Battery Required 7 4 B...

Page 3: ...deliberately or accidentally inserted into the battery box enclosure The battery will discharge naturally if the system is unused for a period It should be recharged every 2 3 months if unused If thi...

Page 4: ...UPS or 2nd battery box 2 DC breaker Battery over current protection breaker 3 External battery numbers detection port detects the numbers of connected batteries 2 2 Installation and setup with UPS Un...

Page 5: ...in accordance with the unit s working specifications to avoid overheat and excessive moisture Do not place the unit in a dusty or corrosive environment or near flammable objects This unit is not desi...

Page 6: ...2021 Lowell Manufacturing Co X Rev 10 21 21 6 Tower installation Connecting with UPS and another Battery Box Follow below installation chart to connect with UPS and another battery box with included...

Page 7: ...gned to operate with the following types of batteries UPS XBPA 36 36V 18Ah Version 6 pieces of 12V 9Ah 3 3 batteries UPS XBPA 36E 36V 36Ah Version 12 pieces of 12V 9Ah 3 3 3 3 batteries UPS XBPA 48 48...

Page 8: ...1 Open the package and place the battery box on a horizontal plane Step 2 Remove the removable front panel part by pulling it from the lower extremity Step 3 Remove the fixed part of the front panel b...

Page 9: ...the same procedure on the right side of battery box Step 7 Connecting all batteries following the wiring diagram shown in chapter 5 Step 8 Secure all batteries inside with the metal plate Note To ins...

Page 10: ...he lower extremity Step 3 Remove the fixed part of the front panel by removing the 2 screws Step 4 Remove the metal top cover of the battery box by unscrewing 8 screws present on the two sides 4 on th...

Page 11: ...he same procedure on the right side of battery box Step 7 Connecting all batteries following the wiring diagram shown in chapter 5 Step 8 Secure all batteries of the 1st and 2nd strings inside with th...

Page 12: ...e lower extremity Step 3 Remove the fixed part of the front panel by removing the 2 screws Step 4 Remove the metal top cover of the battery box by unscrewing 8 screws present on the two sides 4 on the...

Page 13: ...the same procedure on the right side of battery box Step 7 Connecting all batteries following the wiring diagram shown in chapter 5 Step 8 Secure all batteries inside with the metal plate Note To ins...

Page 14: ...e lower extremity Step 3 Remove the fixed part of the front panel by removing the 2 screws Step 4 Remove the metal top cover of the battery box by unscrewing 8 screws present on the two sides 4 on the...

Page 15: ...the same procedure on the right side of battery box Step 7 Connecting all batteries following the wiring diagram shown in chapter 5 Step 8 Secure all batteries inside with the metal plate Note To ins...

Page 16: ...Rev 10 21 21 16 Chapter 5 Wiring Diagrams Note The cable connection from external battery connector to PCB is already present inside the battery box All the other cable connection should be followed b...

Page 17: ...2021 Lowell Manufacturing Co X Rev 10 21 21 17 5 2 UPS XBPA 36E...

Page 18: ...2021 Lowell Manufacturing Co X Rev 10 21 21 18 5 3 UPS XBPA 48...

Page 19: ...2021 Lowell Manufacturing Co X Rev 10 21 21 19 5 4 UPS XBPA 72...

Reviews: