P.O. BOX 3448 • OMAHA, NEBRASKA 68103-0448 • (800) 228-9882
I-5
of 20
0-3F
REV. AL
5954
6/2007
Lozier® Corporation 2007
1.
Snap chalkline on floor for desired locations
of all island runs.
Snap
Chalkline
Here
2.
Lay out parts along chalkline as shown. At this point you will need one Back Panel for the first section of each
island run. Splicer Rails (for two-piece Backs) and Top Rails will be used in later steps. Determine what style
of Base Bracket will be used and refer to step 3a or 3b to install.
3’ or 4’
Base
Fronts
Base
Brackets
Uprites
Base
Brackets
Chalkline
Center Rails
Bottom Rails
Base Fronts
Island Section Installation
Please read each step carefully!
Refer to Component Breakdown on page I-1 before starting.