Chapter 4. Installation and Wiring
4-4
(2)
Panel installation
When mounting the XGT Panel on the panel, please install 100mm or more in each direction.
Note
(1) In order to be less affected by electromagnetic waves (radiation noise) or heat generated by other control devices,
Required.
(2) Install it considering the wiring of power and communication cables.
(3) When the panel cut dimensions are outside the reference tolerance (0 ~ + 1mm) when making the panel, the gap
between the gasket and the panel. The contact area may be reduced, and the waterproof and dustproof effect may be
weakened.
(4) When mounting the product on the panel, use gasket for waterproof and dustproof. The XGT Panel basically has a
waterproof and dustproof gasket is equipped.
(5) If the surface of the panel on which the XGT Panel is mounted is uneven, there is a gap between the XGT Panel and the
panel, or dust may penetrate. Particularly, depending on the material (steel, aluminum, acrylic, etc.) of the panel, This may
require installation environment review. Also check that the gasket and panel are in close contact. It is absolutely
necessary.
(6) If the condition of the gasket is contaminated or damaged due to deterioration at the time of installation or after a certain
period of use, the waterproof and dustproof effect care should be taken because it can be significantly weakened, and if a
gasket needs to be replaced, contact your nearest dealer or service. Please contact the center.
(7) In case of explosion-proof equipment, it should be installed in the environment with pollution degree 2 or less according to
KS IEC 60664-1.
(8) Install the front of the explosion-proof product in a place protected from the inflow of liquid in order to maintain the
explosion-proof performance after installation in accordance with the requirements of the obligatory safety certificate notice
of the protection device (Ministry of Employment and Labor Notice 2013-54)
When installing the product on the panel, use gasket for waterproof and dustproof. The XGT Panel is basically equipped with
a waterproof and dustproof gasket.
(3) Installation location
Please consider screen display and touch use for XGT Panel installation.
If you exceed the display angle below, the screen may not be clearly visible. It is recommended to install the product considering
the angle of view.
100
100
100
100
100
Unit: [mm]
Summary of Contents for iXP2 Series
Page 1: ...Human Machine Interface XGT PANEL iXP2 Series ...
Page 51: ...Chapter 5 XGT Panel Menu Explanation 5 14 ...
Page 127: ...Appendix2 Dimensions APP2 1 Appendix 2 Dimensions Unit mm 1 iXP2 08xxA D ...
Page 128: ...Appendix2 Dimensions APP2 2 2 iXP2 10xxA D ...
Page 129: ...Appendix2 Dimensions APP2 3 3 iXP2 12xxA D ...