(1) 3-point linkage
4-4. Attaching Implement
①
Lift rod (LH)
②
Stabilizer
③
Lower link
④
Lift rod (RH)
①
①
①
①
④
④
④
④
⑤
⑤
⑤
⑤
⑥
⑥
⑥
⑥
⑦
⑦
⑦
⑦
When driving without attaching implement, comply with the followings.
1. Fix upper link(5) with the fixing hook.
2. Connect stabilizer(2) to the lower link(3) to avoid the lateral movement of the lower link.
If 3-point linkage is not necessary, raise 3-point linkage to maximum height and fix it by turning the
down speed control knob, or remove it as follow.
1. Remove upper link pin(7) and upper link(5).
2. Detach rear side of the stabilizer(2) from the lower link(3) while holding lower link tightly not to fall
down.
3. Remove lift rod (LH), lift rod (RH) and stabilizer(2) step by step.
4. Remove lower link(3) carefully not to get hurt due to its weight.
④
Lift rod (RH)
⑤
Upper link
⑥
Lift rod pin
⑦
Upper link pin
③
③
③
③
②
②
②
②
4
4
4
4
- 12
Warning
▶
Before attaching/detaching implement, place PTO switch in OFF position and PTO
gear lever in NEUTRAL ,and apply the parking brake.
▶
When attaching/detaching implement, make sure to assemble and tighten the
connecting parts correctly.
▶
if the tractor is used to tow heavy loads, always use the approved drawbar or hitch
to avoid injury. Never connect to lower link or upper link of 3-point linkage. If not, it
may cause tipping or turnover.
▶
DO NOT connect the implements that require more power than can be generated
by your tractor.
▶
Never stand between implement and tractor when backing up.
4. Remove lower link(3) carefully not to get hurt due to its weight.