3 - 9
SCR inducement strategy – General inducement strategy
General items
Vehicle reach final inducement after 4 hours of operation after failure detection.
Three full power restarts (validation restarts for healing) part of 4 hours time frame.
Validation restarts
- Validation restarts allowed any time after detection.
- Validation restarts are key cycle locked to avoid unintended activation.
- Limited to 30 minutes each.
- After expiring of the 30 minutes is the engine immediately ramped down to final inducement.
- Validation restart is available only for failures that need heated up after treatment system or
active dosing – not for electrical failures, DEF quality or DEF level.
Repeated offenders: after 3 failure detections within 40 hours inducement locked
Failures can be reset only with a dealership tool
- SCR inducement failures.
- Reset of repeated offenders time & event counter.
Summary of Contents for XP8084
Page 1: ...LS TRACTOR OPERATOR S MANUAL XP8084 XP8094 XP8101 ...
Page 2: ......
Page 4: ......
Page 12: ......
Page 70: ......
Page 80: ...3 10 SCR inducement strategy Low DEF level ...
Page 81: ...3 11 SCR inducement strategy poor DEF quality ...
Page 82: ...3 12 SCR inducement strategy SCR System tampering detection ...
Page 188: ......
Page 261: ...5 73 Attachment ...
Page 262: ......
Page 280: ......
Page 282: ...8 2 2 Roll bar type Unit mm When applying front tire 12 4 24 8PR rear tire 16 9 34 8PR ...
Page 287: ......
Page 288: ......