Data Logging on RCI Systems
Introduction
The RCI System Logging occurs automatically whenever the driver lifts a load OR
whenever the RCI System detects an error condition on the crane such as moving
outside the load chart. The installer has the option to set the percentage of SWL a load
must reach before the load will be logged. This
logging percentage
can be set
anywhere between 13% and 110% of SWL.
In addition, the installer can configure three
lift counters
which can count the number
of lifts performed in three distinct SWL % regions below the
logging percentage
.
Description of Logging Features
Data Logging is stored in a circular arrangement. That is, when the logs are full and
another log is performed, the oldest log in the logger will be over-written. Each record
stores the following data:
Date
Date log was recorded (dd/mm/yyyy)
Time
Time log was recorded (hh:mm)
Peak Load
Peak load recorded during log cycle
Stable Load
Maximum Stable load recorded during log cycle
Safe Working Load
SWL at operating position
Percent of SWL
Percentage of SWL
Radius
Operating
Radius
Error Codes
4 digit
standard Robway Error Codes
Duty Number
Selected Duty number
Winch selected
Selected winch
Falls reeved
Selected falls
Over-ride state
Off / On indicates whether display was in over-
ride
Logging is performed automatically when the percentage of SWL exceeds a threshold
value which is set in Function Codes.
When the
logging percentage
is not exceeded while lifting a particular load, the lift
occurrence can still be recorded in a
lift counter
. Three separate
lift counters
can be
configured to store the number of lifts which occur in a particular SWL % region.
Once again, the exact SWL percentages which will be counted can be configured by
setting the appropriate Function Codes.
Summary of Contents for RCI-1502 LM
Page 2: ......
Page 53: ...Appendix 8 1 Data Logging on RCI Systems ...
Page 54: ......
Page 60: ...Data Logging on RCI Systems Example Lift Cycles ...
Page 65: ...Appendix 8 2 Drawings ...
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 71: ...U N C O N T R O L L E D C O P Y ...
Page 72: ...APPROVED BY TOL 0 0 0 1 2 3 4 55 26 2 0 7 2 8 9 1 1 1 1 0 7 5 6 2 ...
Page 73: ......
Page 74: ...APPROVED BY TOL 0 0 0 1 22 3 4 5 6 0 22 2 1 7 8 98 1 7 8 98 7 8 98 7 8 98 1 0 9 8 3 6 8 3 ...
Page 75: ......
Page 76: ... APPROVED BY 0 1 2 22 3 3 3 TOL 4 4 23 4 232 22 3 242 4 2 32 2 3516 7 8 7 7 9 2 3 42 4 2 ...
Page 77: ......
Page 78: ... APPROVED BY 0 1 2 22 3 3 3 TOL 4 4 23 4 232 22 5 0 42 4 2 3617 8 9 8 8 2 ...
Page 79: ......
Page 80: ......
Page 84: ......
Page 85: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......