1.5 Cable Selection
When you install power and signal cables in the terminal blocks, only use cables that meet
the required specification for the safe and reliable operation of the product. Refer to the
following information to assist you with cable selection.
•
Wherever possible use cables with the largest cross-sectional area for mains power wiring,
to ensure that voltage drop does not exceed 2%.
•
Use copper cables rated for 600 V, 75
℃
for power terminal wiring.
•
Use copper cables rated for 300 V, 75
℃
for control terminal wiring.
•
The inverters in the range between 15 and 90 kW must be grounded conveniently with
fixed connections.
•
The inverters in the range between 5,5kW and 11kW must be grounded with and
industrial connector according to IEC 60309.
•
The minimum size of the protective earthing conductor shall comply with the local safety
regulations for high protective earthing conductor current equipment.
•
Only one conductor per terminal should be simultaneously connected
Ground Cable and Power Cable Specifications
Load (kW)
Ground Wire
Input/Output Power Wire
mm
2
AWG
mm
2
AWG
R/S/T
U/V/W
R/S/T
U/V/W
3-Phase 200
V
0.7
5
3.5
12
1.5
1.5
16
16
1.5
2.2
3.7
2.5
2.5
14
14
5.5
10
10
4
4
12
12
7.5
6
6
10
10
11
10
10
8
8
15
14
6
16
16
6
6
18.
5
25
22
4
4
3-Phase 400 0.7
2
14
1.5
1.5
16
16
Summary of Contents for H100
Page 14: ......
Page 18: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 27: ...Preparing the Installation 13 ...
Page 47: ...33 Installing the Inverter ...
Page 48: ...Installing the Inverter 34 Input and Output Control Terminal Block Wiring Diagram ...
Page 61: ...47 Installing the Inverter ...
Page 71: ...Learning to Perform Basic Operations 57 ...
Page 88: ...Learning to Perform Basic Operations 74 ...
Page 103: ...89 Learning Basic Features Code Description V1 Quantizing ...
Page 129: ...115 Learning Basic Features ...
Page 140: ...Learning Basic Features 126 ...
Page 148: ...Learning Basic Features 134 ...
Page 171: ...157 Learning Advanced Features Deceleration dwell operation ...
Page 183: ...169 Learning Advanced Features ...
Page 184: ...Learning Advanced Features 170 PID Command Block ...
Page 185: ...171 Learning Advanced Features PID Feedback Block ...
Page 186: ...Learning Advanced Features 172 PID Output Block ...
Page 187: ...173 Learning Advanced Features PID Output Mode Block ...
Page 197: ...183 Learning Advanced Features ...
Page 201: ...187 Learning Advanced Features Code Description 100 EPID1 Control block ...
Page 202: ...Learning Advanced Features 188 EPID2 Control block ...
Page 237: ...223 Learning Advanced Features Time Period Schedule AP3 38 Except3 Day 01 01 ...
Page 244: ...Learning Advanced Features 230 ...
Page 259: ...245 Learning Advanced Features Code Description Code Description Volt ...
Page 362: ...Learning Protection Features 348 ...
Page 415: ...401 RS 485 Communication Features Item Standards Parity check None ...
Page 524: ...Table of Functions 510 ...
Page 533: ...Table of Functions 519 ...
Page 547: ...533 Troubleshooting ...
Page 585: ...Technical Specification 571 ...
Page 594: ...580 ...
Page 595: ...581 ...
Page 596: ...582 ...